Sheet Piling with Press-in Methods adjacent to a live Railway Woodside Park, London << Back to ‘Rail’ case studies << Back to ‘Building’ case studies Specialist sheet piling contractor Fussey Piling Limited, was invited by HG...
Rail Case Study – Canary Wharf Crossrail Station Tubular cofferdam (2015) << Back to ‘Rail’ case studies Completed in 2015, the Canary Wharf Crossrail Station in East London was the first Elizabeth Line station built. The piles and concrete...
RAIL CASE STUDY – EDINBURGH TRAM NETWORK TOWER PLACE BRIDGE, SCOTLAND << Back to ‘Rail’ case studies Edinburgh’s urban population continues to grow. Between 2004 and 2024, the population in Edinburgh is estimated to grow by around 45,000...
RAIL CASE STUDY – LONDON UNDERGROUND UPGRADE CHAPEL STREET, LONDON << Back to ‘Rail’ case studies The new ‘S’ stock trains that are to be introduced on the SSL network have a higher power rating than the existing fleets. Their increased...
RAIL CASE STUDY – WHITE HORSE BRIDGE WEMBLEY STADIUM STATION, LONDON (2006) << Back to ‘Rail’ case studies Main contractor Edmund Nuttall Ltd, were awarded a challenging contract to construct a new bridge and associated infrastructure, to...