Client: Elliott Thomas
Contractor: Fussey Piling Limited
Location: Ewer Street, Southwark, London
Scope: Permanent cofferdam for basement construction
Piles: Arcelor Mittal PU22-1mm 10.0m lengths in Grade S355GP

Ground Conditions: Made Ground, overlaying Sand and Gravel, overlaying London Clay.
Value: £140k approx.
Completion Date: 2013

Elliott Thomas appointed Fussey Piling to design and install a permanent cofferdam, 78m perimeter (with temporary steel framing), on a compact London site for a new accommodation block housing 150 students. The basement provided for plant rooms, cycle storage and laundry facilities.

The site sat between Network Rail assets (approx. 5m clearance), local roads and existing office buildings, whilst the Jubilee Line ran 14m below the toe of the piles.

Fussey Piling utilised one of their WP150 “Silent & Vibration-Free” sheet pile presses, working with a Sennebogen crawler crane, to minimise disturbance to neighbouring properties and structures.

The perimeter was pre-augered to the full depth of the piles before installation, using an auger mounted to a Bauer RTG16T, to ensure the sheet piles entered the ground smoothly.

Steel Piling Group, C/O SCI, Silwood Park, Unit D, Buckhurst Road, Ascot ,Berkshire. SL5 7QN
E: info@steelpilinggroup.org

SCI Logo

© Copyright 2018 Steel Piling Group
Terms & Conditions | Privacy Policy