For sheet piling to be truly sustainable, they must be extractable at the end of the structure life, such that reuse can be maximised and piles which are not reusable can be recycled. The new range of extractors with extraction capability of up to 1000 Tonnes pulling force means that hardly any pile, on land, is now unrecoverable.
Read about Sustainability
Case Studies
A selection of our work
Steel Piling Group, C/O SCI, Silwood Park, Unit D, Buckhurst Road, Ascot ,Berkshire. SL5 7QN
E: info@steelpilinggroup.org
© Copyright 2018 Steel Piling Group
Terms & Conditions | Privacy Policy